Passenger Vehicle Batteries

Passenger Vehicle Batteries

Our Product Lines

High Performance

NCM Series

Nickel Cobalt Manganese

For customers who need higher energy density. We offer NCM523, NCM622, and NCM811 configurations.

We typically recommend NCM for vehicles with range targets above 500km or premium positioning where pack weight matters.

Cell Energy Density 220-280 Wh/kg
Note NCM811 = Highest Density
Thermal Management Stricter Requirements
Advanced Integration

CTP and CTC Solutions

Cell-to-pack eliminates traditional modules. We've been doing CTP since 2020. Current generation achieves 66% volume utilization.

Cell-to-chassis is newer for us. We have two production contracts signed, first deliveries scheduled for Q2 next year. Integration with body structure reduces total weight by about 8% compared to CTP.

66%
CTP Volume Utilization
~8%
CTC Weight Reduction
2020
CTP Since
Q2
First CTC Deliveries

Technical Specs + FAQ

Q

What pack voltages do you support?

Standard configurations: 400V and 800V systems.

400V is still the majority of our orders. 800V adoption is growing fast though. Last year 800V was 12% of new contracts. This year it's closer to 30%.

We can do custom voltage ranges for specific platforms. Minimum order quantity applies.

Q

What about thermal management?

Liquid cooling is standard on all our passenger vehicle packs. Coolant channels run between cell rows. We design for inlet temperature up to 40°C ambient with maximum cell temperature delta under 5°C across the pack.

For LFP packs in mild climates, some customers opt for our simplified cooling system to save cost. We don't recommend this for NCM.

Heating is integrated for cold climate variants. PTC heaters bring cells to operating temperature in about 15 minutes at -20°C. We had a customer in Harbin test our packs for two winters before signing. They were paranoid about cold performance. Understandable.

Q

What safety testing do you do?

All packs pass GB 38031-2020 requirements. That covers overcharge, over-discharge, external short circuit, drop, immersion, thermal shock, the full list.

For export customers we also certify to UN38.3 and relevant regional standards. ECE R100 for Europe. FMVSS for US market.

We do nail penetration testing on cells even though it's not required anymore. Old habit. Two of our engineers came from a company that had a field recall in 2019. They're particular about this.

Q

What's your defect rate?

Pack-level field failure rate for 2023 was 0.038%. Majority of those were BMS communication faults, not cell failures.

We track every pack through its lifecycle. Serial number links to full production records, test data, and any warranty claims.

Capacity and Lead Times

Production Capacity

Hefei plant 15 GWh annual
Changzhou plant 8 GWh annual
New facility in Yibin coming online late this year, adding 20 GWh

Typical Lead Times

Existing validated design 8-10 weeks from PO to delivery
New platform development 14-18 months from initial spec to SOP

We keep safety stock of common cell formats. Custom configurations take longer.

What We Need From Customers

For new platform quotes

Required Information

Target pack capacity (kWh)
Voltage architecture (400V/800V)
Available packaging space (CAD preferred)
Weight target if applicable
Expected annual volume
Target SOP date
Cooling system interface specs
Regional market (affects certification scope)

Our Process

1
Phase 1

Initial feasibility review takes about 2 weeks. We'll come back with preliminary specs, rough pricing, and any concerns about the packaging space or timeline.

If the numbers work for both sides, we sign an NDA and development agreement.

2
Phase 2

Detailed design phase. Our application engineers work with your team on mounting points, cooling connections, HV/LV interfaces, BMS integration.

We build A-sample packs for your validation testing. Usually 5-10 units depending on test plan.

3
Phase 3

B-sample and C-sample builds incorporate design updates from A-sample testing. PPAP documentation prepared in parallel.

Tooling investment happens here. Customer typically funds tooling. We offer amortization options for high volume programs.

4
Phase 4

Production ramp. We start at reduced line speed for the first 2-3 months. Quality team is on-site at customer plant during launch support period.

NOTES

We don't do small batch custom work anymore. Minimum program commitment is 5,000 packs annually. For lower volumes we can refer you to some smaller suppliers we've worked with before. If you need prismatic cells only without pack integration, minimum order is one container, roughly 2,000 cells depending on format. Contact our sales team in Hefei for cell-only inquiries.